So we met the contractor today to go over the plans and make sure we had everything we wanted in the plans and up to date. Jesse's dad also came with us which was good as he also had some good ideas.



Interior



Jesse made sure that the sliding doors will be put on the porch not French. There is also potential for a floor to ceiling window in front of the stair case and two double windows in our bedroom to make the elevations look better. We also discussed the new powder room and narrowing the stairs to create more space for the closet in our bedroom, but also keeping the narrowing for the rest of the hall way up stairs.



We need to select Tile and flooring and Cupboards, but are thinking red tile for the kitchen, dining room and porch. Going to see Stick and stones and all others in the area tomorrow.



Tony mentioned us meeting a guy to go over windows and doors with him at the house, also to contact Mrs. Deshields or Mr. Tucker at BAC.



Jesse and I need to check if the stairs and hall way have recessed lighting as that is what we thing we need.



Landscaping



The stairs to the dock will put in place alongside the house with a hand railing from the garden. The garden will be dug out behind the house and we discussed putting a temporary fence to be put in place until the hibiscus has grown up.



The front of the house shall be extended to the widest point which it is at now and shall also need a rail to pass health and safety.



The entrance stairs shall be moved back away from the house, so cut short and built up alongside the current raised flowerbed.



The porch shall be all one level, by pouring concrete.



There were three guys there today removing the floor upstairs. (M,S,YL)