1. Tony suggested coming from the second floor down to demolition the back wall. He will go all the way to the back wall if there are no complications. He will have to leave about a foot of additional rock under the walls to maintain the integrity of the foundation.


2. Tony also suggested putting in a concrete beam on the north side of the living room as the current walls will not support the roof once we start replacing the doors. Once this beam is in we can play with the exact location of the doors without any worry of the structural integrity.


3. He said hardwood floors handle water better. We should do some IBR on this.


4. He gets 20% off on top of the sale price that he will pass on to us at Arnolds Tile.


5. He will get us a couple options and pricing on the brick. I said we may go back to the Mexican tile on the verandah depending on price etc.


6. He will measure and give the sq footage for the wood floors.


7. Do we want tile up the side walls of the bathrooms? Maybe we do.


8. Plumber comes in and then the electrician.


9. He thinks we are still on time and budget schedule.


10. I told him again about the towel warmers, ice maker, box on kitchen floor for potential island.


11. He is using Norman at PVC windows. He will use all standard sizes except the french door and side slats might be special order from kitchen to porch.


12. Belco was still live so they are coming today or tomorrow to disconnect.


13. He talked to BAC and they came to have a look. He should have a quote back today or tomorrow